Friday, 24 September 2010

Preliminary video

Here is our groups Preliminary video, many mistakes such as sounding, and minor camera work cropped up as noticable errors, here are some other noticeable errors;


A few of the most noticeable errors are:
- Poor lighting in lift scene
- CCTV timer is counting from 0 and resets during clip
- School displays are on show
- Continuity error between 1.19 - 1.20

Consequently from this video, a lot of ideas have surfaced that we will use in our final video. Again, these idea's will be explained in furthur posts.

Thursday, 23 September 2010

Complication (Adobe pro)

With numerous problems with this program such as Rendering, Lagging and Freezing, a joint decision was made to do the main editing for this PRELIMINARY task at Isaac's house where we use the program;

Song Vegas

This is because that Isaac actually owns this software and is much more used to the layout and features so we have the maximum knowledge to get the best outcome.

Media Lesson (23rd September)

Me, Isaac and Luke had 4 units of media today so had a long period of time to get work done. We all had specific jobs to do in this time period.

Me: My job was to choose the specific clips for the second part of the video and put them in order in adobe pro.

Isaac: His job was to collect the clips for the first half and put them in order using the same program.

Luke: Catch up with blog and help out my and Isaac when needed.

Friday, 17 September 2010

Media Lesson (Friday 17th September)

After a long period of babbling around school trying to import our video clips onto the school system, we finally managed to succeed. In the hour period left of this lesson, Myself and Isaac have gone through the two different folders and just watched and got a over-view of all our video clips. Meanwhile Luke has been completing his blog and is now fully caught up.

Thursday, 16 September 2010

Luke Pitchford

Today, mine and Isaac's friends decided to undertake AS Media Studies. We have welcomed him into our group and are looking forward to his input over the next two year period.

A link to his blog will be published on my home page very soon.

Storyboard

Over the past couple of days me and my partner Isaac have been creating our storyboard for our preliminary task.

Here is a picture of our storyboard;

Friday, 10 September 2010

Continuity

Continuity, as like match on action, shot reverse shot and 180 degree rule is an essential term in media. The overall concept is very simple;

Continuity is the continuation of a scene with numerous shots integrating within each other (which could have been shot in different time periods) without breaks in the scene. It also is a variation of small scenes that keeps the movie flowing without spending too much time on one particular scene.

E.G.
  • Get on the train
  • Sit down in the train cabin
  • Get off the train



I will analyse the first 10 seconds of this scene from the oscar winning movie series;

1-2 Seconds: For the first second and a half, the camera angle starts with a long shot. It then changes angle to a close up of Rocky facing Clubber Lang.

4 seconds: The camera angle stays theoretically the same but changes from a close up to a long shot.

5-10 seconds: The camera angle stays the same and the shot style (long shot) also remains the same also.